Return to the New Vashon Island High School

the New Vashon Island High School:
the Building C Demolition

 ·  the Building C Demolition: 07/18/2012 · 

 ·  the Building C Demolition: 07/16/2012 · 

 ·  the Building C Demolition: 07/13/2012 · 

 ·  the Building C Demolition: 07/12/2012 · 

 · the Building C Demolition: there and back again · 

Please return to
the New Vashon Island High School
home page for construction site photos from other dates

the New Vashon Island High School - the Building C Demolition

Go to the top

the Building C Demolition: 07/18/2012

Monday, July 18, 2012. Building C is ... gone...

5924_Bldg_C_demo_071812

Loading debris. It went over to Seattle to be separated and recycled. The leftovers went down to a landfill in Oregon.

6024_Bldg_C_demo_071812

Metal was separated out from everything else during demolition.

6066_Bldg_C_demo_071812

Utility vault work in the driveway right at the entrance to the A building. B building directly behind.

6088_Bldg_C_demo_071812

Sod and the old paving is stripped off and piled.

6133_Bldg_C_demo_071812

The B building has had its north end demolished to make room for the new building footprint. The B building will ultimately be demolished.

6159_Bldg_C_demo_071812

All that remains of the C building is the slab floor.

the Building C Demolition: 07/18/2012

Go to the top

the Building C Demolition: 07/16/2012

Monday, July 16, 2012. Building C is down to the back wall and parts of the side walls, and they're trucking debris off-Island. Plus, barn swallows, and a peregrin!

5519_Bldg_C_demo_071612

The C building is down to three exterior walls.

5583_Bldg_C_demo_071612

Swallow!!

5596_Bldg_C_demo_071612

This slab was cut off a cedar felled between the B and C buildings. Some sort of exterior furniture will be made from it.

5615_Bldg_C_demo_071612

Utility vaults are trucked in and unloaded.

5693_Bldg_C_demo_071612

The excavator chews away at the remaining C building walls.

5886_Bldg_C_demo_071612

Getting right down to the bitter end.

the Building C Demolition: 07/16/2012

Go to the top

the Building C Demolition: 07/13/2012

Day two, Friday, July 13, 2012. Demolition's progressed, to say the least. There's almost nothing left but three walls of the building shell, and a bunch of sorted debris.

5314_Bldg_C_demo_071312

The interior of the C building is slowly reduced to nothing.

5338_Bldg_C_demo_071312

As the sod is stripped off, cobbles are brought in and stockpiled. The cobbles will be used in over 600 pilings.

5361_Bldg_C_demo_071312

The remains of the C building were sorted and piled as the building came down.

5391_Bldg_C_demo_071312

Munch munch...

5423_Bldg_C_demo_071312

Some of the green piping was used to tight-line the new storm drain system.

5466_Bldg_C_demo_071312

Nothing really left of the C building but the exterior walls.

the Building C Demolition: 07/13/2012

Go to the top

the Building C Demolition: 07/12/2012

Day one, Thursday, July 12, 2012. I went down in the morning, and again in the afternoon. In morning the front wall had been knocked down and the interior was being gutted. Way more time was being spent sorting and piling scrap than actually knocking anything down.

5037_Bldg_C_demo_071212 5058_Bldg_C_demo_071212 5079_Bldg_C_demo_071212
5104_Bldg_C_demo_071212 5130_Bldg_C_demo_071212 5153_Bldg_C_demo_071212

Day one, Thursday, July 12, 2012. By that afternoon the interior had been gutted back to the second set of classrooms.

5182_Bldg_C_demo_071212 5221_Bldg_C_demo_071212 5227_Bldg_C_demo_071212
5236_Bldg_C_demo_071212 5247_Bldg_C_demo_071212 5259_Bldg_C_demo_071212

the Building C Demolition: 07/12/2012

Go to the top

the Building C Demolition: there and back again

Sometimes I just like to take photos of the same mundane walk I've followed dozens of times...

5261_Bldg_C_demo_071312 5265_Bldg_C_demo_071312 5266_Bldg_C_demo_071312
5339_Bldg_C_demo_071312 5347_Bldg_C_demo_071312 5355_Bldg_C_demo_071312

the Building C Demolition: there and back again


Return to the New Vashon Island High School

the New Vashon Island High School:
the Building C Demolition

 ·  the Building C Demolition: 07/18/2012 · 

 ·  the Building C Demolition: 07/16/2012 · 

 ·  the Building C Demolition: 07/13/2012 · 

 ·  the Building C Demolition: 07/12/2012 · 

 · the Building C Demolition: there and back again · 

Please return to
the New Vashon Island High School
home page for construction site photos from other dates


Canon EOS 1D Mark IV Digital Imaging!

Canon EOS 1D Mark IV digital imaging

All my digital photography
copyright John D Sage/FinchHaven™
1999, 2000, 2001, 2002, 2003, 2004, 2005, 2006, 2007, 2008, 2009, 2010, 2011, 2012 etc etc...

Valid HTML 4.01 Transitional

This page preened using gedit 2.30.4 at www.FinchHaven.com by Webmaster


Last modified: Saturday 05/13/2023 09:37:54 PDT for https and edits

Go to the top