Return to the New Vashon Island High School

the New Vashon Island High School:
the construction site 08/23/2012

Please return to
the New Vashon Island High School
home page for construction site photos from other dates

the New Vashon Island High School: Construction site 08/23/2012

7334_New_VHS_construction_082312

Looking from the entrance to the A building out across the lawn

7943_New_VHS_construction_082312

The VHS Rock has been moved ... away

7965_New_VHS_construction_082312

The C Building was just to the left. They've started building a temporary gravel walkway out to the Stadium

7969_New_VHS_construction_082312

The two portables which are going to be four science classrooms, on top of the tennis courts closest to the gym

8020_New_VHS_construction_082312

The A building will be open, but will be completely walled-off from the construction sites.

8034_New_VHS_construction_082312

The C building was at those piles of gravel off in the background. The B building has had its north end cut off. You can see the temporary gravel walkway out to the Stadium right along the gym.


Return to the New Vashon Island High School

the New Vashon Island High School:
the construction site 08/23/2012

Please return to
the New Vashon Island High School
home page for construction site photos from other dates


Canon EOS 1D Mark IV Digital Imaging!

Canon EOS 1D Mark IV digital imaging

All my digital photography
copyright John D Sage/FinchHaven™
1999, 2000, 2001, 2002, 2003, 2004, 2005, 2006, 2007, 2008, 2009, 2010, 2011, 2012 etc etc...

Valid HTML 4.01 Transitional

This page preened using gedit 2.30.4 at www.FinchHaven.com by Webmaster


Last modified: Saturday 05/13/2023 09:42:08 PDT for https and edits

Go to the top