This was really the first big deadline: on August 28, 2012, the admin staff and the teachers had to be able to get into the VHS buildings to start getting ready for the upcoming school year. Which meant that the construction perimeter had to be almost completely reset to the configuration that would be permanent through the majority of the construction cycle. Which meant that anything *outside* of that perimeter had to either be finished, or under secure cover. Skanska made it!

I got a little tour of the entire new perimeter with Sharon (Skanska: site access and safety) including a walk down to the location of the new septic system, where work was still underway and which I hadn't yet seen.

I took basically two laps of the perimeter, one with Sharon and one without, and then went over to McMurray and walked back to the Stadium to get some photos from the top of the bleachers.

Go to the top

Set one

8062_New_VHS_Construction_082812

The new construction perimeter. B Building on the left, C Building was straight ahead toward the gym in the background.

8078_New_VHS_Construction_082812

The new septic system. First approval of this design in the entire state.

8088_New_VHS_Construction_082812

Looking from the front of the gym past where C Building was, over to B Building in the background. That green stuff is new hydroseeding.

8106_New_VHS_Construction_082812

The Tunnel: the new entry to A building, the Admin offices, the Commons, the Theater, etc. There's some plan to have the kids paint the new plywood walls on the right.

8139_New_VHS_Construction_082812

The wall will be finished to completely enclose the A Building because at least one corner of the new high school will be just feet away.

8154_New_VHS_Construction_082812

At the far end of the pedestrian walkway on the edge of the parking lot. C Building was dead ahead. Gym and the Stadium are off down the new gravel driveway just out of the photo to the right.

Set one

Go to the top

Set two

8159_New_VHS_Construction_082812

The two new portable on the tennis courts, with the gym in the background.

8168_New_VHS_Construction_082812

Looking across the front of the gym C Building was immediately ahead, with B Building off in the background.

8191_New_VHS_Construction_082812

And looking back at the front of the gym toward the portables.

8217_New_VHS_Construction_082812

From the McMurray side, ground-level, looking through the fence toward the A Building.

8283_New_VHS_Construction_082812

Up on top of the bleachers looking down onto the new gravel driveway alongside the gym connecting the parking lots to the Stadium. Work's not quite finished here...

8291_New_VHS_Construction_082812

Most of the building site, from the top of the bleachers.

Set two


Return to the New Vashon Island High School

the New Vashon Island High School:
Construction site 08/28/2012

 · Set one · Set two · 

Please return to
the New Vashon Island High School
home page for construction site photos from other dates


Canon EOS 1D Mark IV Digital Imaging!

Canon EOS 1D Mark IV digital imaging

All my digital photography
copyright John D Sage/FinchHaven™
1999, 2000, 2001, 2002, 2003, 2004, 2005, 2006, 2007, 2008, 2009, 2010, 2011, 2012 etc etc...

Valid HTML 4.01 Transitional

This page preened using gedit 2.30.4 at www.FinchHaven.com by Webmaster


Last modified: Saturday 05/13/2023 09:53:24 PDT for https and edits

Go to the top