Return to the New Vashon Island High School |
the New Vashon Island High School:
|
Please return to |
This was really the first big deadline: on August 28, 2012, the admin staff and the teachers had to be able to get into the VHS buildings to start getting ready for the upcoming school year. Which meant that the construction perimeter had to be almost completely reset to the configuration that would be permanent through the majority of the construction cycle. Which meant that anything *outside* of that perimeter had to either be finished, or under secure cover. Skanska made it! I got a little tour of the entire new perimeter with Sharon (Skanska: site access and safety) including a walk down to the location of the new septic system, where work was still underway and which I hadn't yet seen. I took basically two laps of the perimeter, one with Sharon and one without, and then went over to McMurray and walked back to the Stadium to get some photos from the top of the bleachers. |
Go to the top
Go to the top
Return to the New Vashon Island High School |
the New Vashon Island High School:
|
Please return to |
Canon EOS 1D Mark IV digital imaging |
All my digital photography |
This page preened using gedit 2.30.4 at www.FinchHaven.com by Webmaster |
Last modified: Saturday 05/13/2023 09:53:24 PDT for https and edits
|
Go to the top |